How to improve the production efficiency of hydraulic water well drilling rigs?

Jan 20, 2022

How to improve the production efficiency of hydraulic water drilling rigs? The following small series illustrate the use of preventive measures.

1. After the drill bit of the hydraulic well drilling rig is drilled into the structure, the center drilling tool should be replaced in time. First, you need to clean the bottom of the hole, and then remove all residue from the bottom of the hole. When the drill bit stops rotating, the drill bit of the hydraulic well drilling rig will be drilled out. This is most suitable when the lifting force is slowly increasing and the lifting force is sufficient to lift the drill.

2. The drilling process summarizes the drill bit of the hydraulic well drilling rig. In addition, it is necessary to pay attention to the subsequent working conditions of the casing, determine the specific conditions of drilling, clean up the borehole in time, and drill the bit on the water drilling equipment. During this process, strong lifting is prohibited.

3. There will be more residues at the bottom of the hydraulic oil well. The eccentric drill bit clings to the slag and affects collection and production. At this point, you need to provide compressed air and clean the holes again. Then, after running the down-the-hole hammer for a period of time, run the model of the drilling equipment, and then perform the lifting work of the center drill again.

Working system of hydraulic water well drilling rig and matters needing attention:  Since the movement system of the pocket machine is different from the working state and working characteristics of each device, it is divided into three parts: rotation system, circulatory system and circulatory system. And the system is fully configured in this way.

钻机2.jpg


  • 8615865715332

    Inquire Now and Enjoy 3% Product Promotion