Water well drilling rig is a drilling equipment widely used in water conservancy construction, farmland engineering geothermal drilling, etc. No matter what equipment it is, it needs maintenance and maintenance to better improve work efficie ...
When the water well drilling rig is in construction, it needs to be drilled continuously, and the non-stop operation requires a stable production platform, so as to ensure the stable production of the water well drilling rig. The selection ...
DTH drilling rig is a kind of drilling machine, which is often used for drilling rock anchor cable holes, bolt holes, blasting holes, grouting holes and other drilling constructions in urban construction, railway, highway, river, hydropower ...
There are many common names for fully hydraulic anchor drilling rigs, such as bolt drills, down-the-hole drilling rigs, water drills, rock drills, rock bolt impact drills and so on. The anchoring drilling rig is mainly used in the landslide ...
At present, the commonly used technical methods to improve the vertical bearing capacity of cast-in-place piles include bottom expansion method and post-grouting method of bored cast-in-place piles. 1.Bottom drilling method In the same form ...
For rig operators, track de-chaining is a frequent problem. For drilling rigs, occasional disconnection is unavoidable, because the working environment is relatively harsh, and the crawler tracks enter soil or stones will lead to disconnect ...
At present, the commonly used technical methods to improve the vertical bearing capacity of cast-in-place piles include bottom expansion method and post-grouting method of bored cast-in-place piles. Bottom drilling method In the same formati ...
The biggest difference between pneumatic drilling rigs and ordinary drilling rigs is the drilling method. Ordinary drilling rigs usually use rotary drilling, that is, relying on the rotation of the power head to drive the drill pipe and dril ...
The newly purchased water well drilling rig generally needs to go through a running-in period of 60 hours. A water well drilling rig in the break-in period has the following characteristics: 1. Fast wear and tear 2. Poor lubrication 3. Easy ...
When the pile driver suddenly tilted and misplaced during the construction of the pile driver, and at the same time the pile hammer jumped up and the pile body rebounded, the construction had to be stopped. There are several reasons for the ...
8615865715332